“For each country in the world show available for future use energy sources (gw) and available chips for AI to estimate chances to win AI race. Show on map. Make it beatiful”
Best-effort map from the verified rows available in the supplied source excerpts: 9 operational GPU clusters from Epoch AI’s GPU Clusters database (all in the United States, latest first-operational date July 2025), plant-level nameplate capacity from the WRI Global Power Plant Database excerpt (Afghanistan complete at 0.30 GW, Albania partial), and 2024–2025 electricity generation context from Ember via Wikipedia. Every country stays on the map; those without verified figures are gray, never zero.
AI infrastructure readiness score (0–100): 75% normalized log(1 + H100-equivalents) + 25% normalized log(1 + installed GW). A transparent infrastructure proxy, not a forecast. Compute is weighted more heavily because chips, not grid size, are the binding constraint. Only one country has verified chips in these excerpts, so cross-country normalization is degenerate; scores are shown as partial.
Annual generation in TWh (Ember, 2024–2025). Shown separately: generation (TWh) is not installed capacity (GW), and the two are never mixed in the score.
| Country | Installed GW (verified) | Energy breakdown | AI chips | H100 equiv. | Clusters | Latest date | Source |
|---|
| Cluster | Owner | H100 equiv. | AI chips | Power (MW) | Operational |
|---|
Method: built from four supplied result sets — the opening excerpt of Epoch AI’s gpu_clusters.csv (9 complete operational rows, all US, first-operational dates Sep 2024–Jul 2025, H100-equivalents preferred over raw chip counts), the opening excerpt of the WRI Global Power Plant Database (plant nameplate MW ÷ 1,000 = GW; Afghanistan complete, Albania truncated mid-country and marked partial), Ember 2024–2025 generation tables via Wikipedia (TWh, context only), and Epoch documentation/metadata pages. A UNdata extraction covered 2024 but held only an Afghanistan shell row with no capacity value and is treated as missing, not zero. Countries without verified rows are gray “No verified data”. The readiness score is an infrastructure proxy — 75% compute, 25% power — and national capacity is not power contractually available to AI data centers. Cut for space: sources beyond the top 15 generation rows and unverified third-party country rankings.