“I need a list of major Mistral data centers with a few reliable sources per data center”
Public reporting supports three major, specifically located physical infrastructure projects tied to Mistral AI — as tenant, long-term investor or joint-venture partner, not necessarily owner-operator. The evidence here is 18 source rows across 7 publishers; after excluding generic listing pages and unconfirmed sites (EcoDataCenter Falun and Smedjebacken) and merging alternate labels, coverage is these three projects.
Units and scopes differ and are not directly interchangeable: Bruyères-le-Châtel's 44 MW is powered capacity for Mistral's own deployment, Borlänge's 250 MW is the campus's first phase, and Fouju's ~1.4 GW is a full build-out target. GPU counts and investment figures are separate measures again. Hover or tap a bar for the full picture.
| Project | Location | Owner / operator | Mistral's role | Status | Reported scale | Sources |
|---|
Method: built from a researched source table of 18 rows across 7 publisher hosts (Data Center Dynamics, EcoDataCenter, MyNewsDesk, GE Vernova, MGX, Data Center Sweden, DCD Spanish edition), compiled 2026. "Mistral data centers" means major announced physical projects where Mistral is tenant, investor-partner or JV partner — not sites it owns outright. Excluded: generic DCD index pages, cloud regions that merely serve Mistral models, and EcoDataCenter's Falun and Smedjebacken sites, which the rows do not establish as the announced Mistral project. No single URL backs more than one row; the Bruyères-le-Châtel bibliography is a single-publisher (DCD) shortlist. MW figures mix powered capacity, campus phases and full build-out targets; charted on a log scale for comparability.