China has the only scaled, operating subsea data centers; Panthalassa leads the startup race

The field spans at least 30 developers, operators and industrial partners, but only China’s Hainan and Shanghai projects have crossed into multi-module or commercial operation. Among venture-backed companies, Panthalassa is furthest ahead after two sea trials and $140m raised; most floating-data-center programs remain in engineering or planning.

2
scaled operating projects
24 MW
Shanghai commercial design
$140m
Panthalassa raised
30+
organizations in the field
How far the leaders have progressed
Evidence-based maturity, not market valuation
blue operating · lighter blue earlier
Hainan / Highlander
operational
Shanghai / HiCloud
commercial
Nautilus
operated 6.5MW
Microsoft Natick
pilot; shelved
Panthalassa
2 sea trials
Samsung / Mousterian
engineering
MOL / Kinetics
development
Seatrium
design approval
Atomarine
pilot planned

Three leaders, for different reasons

Most advanced deployed

Highlander / Hainan

Operational · 100 pods planned

China’s Hainan underwater AI center went live in February 2025. It is the strongest evidence of repeatable, modular subsea deployment.

Commercial-scale leader

HiCloud / Shanghai consortium

24 MW · offshore-wind linked

The Lingang project is described as in commercial operation. HiCloud, China Communications Construction and China Telecom appear in overlapping developer/operator roles.

Leading venture-backed startup

Panthalassa

$140m raised · Ocean-3 next

It completed Ocean-1 and Ocean-2 sea prototypes and targets commercialization in 2027. Reporting identifies Peter Thiel as the investment lead.

What the evidence says

  1. Deployment leadership is Chinese. Hainan is operational and Shanghai’s 24MW installation is reported in commercial operation. chinadaily.com.cn · marineinsight.com
  2. Panthalassa has the clearest startup financing and test record. Sources report $140m led by Peter Thiel and an Ocean-2 trial off Washington, with commercial systems targeted for 2027. finance.yahoo.com
  3. Nautilus proved a sizeable floating facility, but momentum weakened. Its Stockton barge reached 6.5MW and operations, yet was put up for sale in 2024. cloudcomputing-news.net
  4. The next wave is shipyard-led. Samsung/Mousterian, MOL/Kinetics/Hitachi, Seatrium and Keppel have 25–73MW designs or projects, but these trail live Chinese facilities. gcaptain.com · oedigital.com

Comprehensive company and project shortlist

Organization / groupTypeApproach / capacityCurrent evidenceStartup capital / leadsSource
Beijing Highlander / COOEC / SinnetChinese public/industrial groupSubsea; 100 pods plannedHainan operational; further constructionn/adatacenterdynamics.com
Shanghai HiCloud / Hailanyun; CCCC; China TelecomPrivate + state/public partnersSubsea + offshore wind; 24MWCommercial operationNot disclosedpeople.cn
Nautilus Data TechnologiesPrivate companyWaterborne barge; 6.5MWOperated; asset put up for sale in 2024$100m reported; lead not establishedcloudcomputing-news.net
Microsoft + Naval GroupPublic + industrial partnerSeabed capsule; 855 serversSuccessful Natick pilot; shelvedn/amicrosoft.com
PanthalassaStartupWave-powered floating nodesOcean-1/2 tested; Ocean-3/commercial target 2027$140m; Peter Thiel reported leadsingularityhub.com
Subsea CloudStartupUnderwater; proposed 13,500 serversPermits/claims reported; operating status not independently clearNot discloseddatacenterdynamics.com
NetworkOceanStartupUnderwater; 500kWSan Francisco Bay test plannedNot disclosedgizmodo.com
AtomarineStartupOffshore barges; 75–100MW modules, ~450MW visionNatural-gas pilot targeted 2028Amount not disclosed; Y Combinator backerdealroom.co
Samsung Heavy Industries + MousterianPublic + private developerFloating; first 50MW, designs to 200MWEngineering contract and class approvalsMousterian funding not disclosedgcaptain.com
MOL + Kinetics/Karpowership + HitachiPublic + subsidiariesConverted ship / powership; 73MWIn development; 2027 deployment plannedn/adailysabah.com
SeatriumPublicJetty-moored barge; 30MWApproval in Principle, July 2026n/aoedigital.com
Keppel Data CentresPublic-company subsidiaryFloating modular park; reported 25MWPlans / early work; 2028 target reportedn/athetechcapital.com
Mocean EnergyPrivate companyBlue Core: wave/solar/battery floating AI racksConcept / pre-Series A developmentRaising £5m; not counted as raiseddailybusinessgroup.co.uk
Optimal TransitJoint ventureKraaken floating platform; 10/100MWUnveiled conceptNot disclosedidcnova.com
DeepGreen Cook Inlet SPVPrivate SPVUnderwater, AlaskaPreliminary environmental/engineering applicationNot disclosedadn.com
KIOST + POSCO + GS E&C + SK TelecomResearch/public/private consortiumUnderwater complex; 100,000-server ambitionResearch agreement / planningn/adatacenterdynamics.com
NTT Facilities + Eurus + MUFG + NYKJapanese consortiumFloating, solar + batteriesPilot announcedn/aenlit.world
Denv-RPrivate companySmall floating container, NantesDemonstrator deployedNot disclosedcloudcomputing-news.net
Aikido TechnologiesPrivate company/startupOffshore wind + modular AI data centerConcept / early entryNot discloseddatacenterdynamics.com
Method: web scan conducted 25 Aug 2026 across 1,900+ unique search results; 48 extracted organizations were normalized into project groups and filtered to builders, operators and material development partners. “Advanced” ranks demonstrated operation first, then sea trials, engineering/construction, approvals and concepts. Funding means cumulative startup capital reported by sources, excluding project finance; blank or “not disclosed” means no reliable amount surfaced.