“Map every submarine internet cable that entered service since 2020: name, landing points, length, owners, and capacity.”
This inventory covers 44 cable systems with a verified ready-for-service date between January 2020 and the research cutoff of 1 September 2026, deduplicated from 345 source pages. Lengths are in kilometres and capacity is design capacity in Tbps; a blank means no verified figure was found. Colour marks the RFS year.
Lines connect stated landing points along schematic great-circle paths — they do not depict the seabed route. 31 of the 44 systems had named landing points that could be placed; the rest appear in the table only.
| Cable | RFS | Length (km) | Owners | Design capacity (Tbps) | Landing points | Source |
|---|
Method: 44 submarine cable systems with a verified actual ready-for-service / entered-commercial-service date from 2020-01-01 through the research cutoff 2026-09-01, deduplicated by system name from 345 source pages (mainly submarinenetworks.com, cross-checked against TeleGeography's cable index and API records). Systems described only as planned, expected or under construction were excluded, as were upgrades or new segments of pre-2020 systems. Length is stated system length in km; capacity is design capacity in Tbps — blanks mean no verified figure was found, not zero. Landing-point connections on the map are schematic great-circle lines between stated landing points, not seabed routes; 13 systems lacked placeable landing points and are listed in the table only.